Date: February 2026
Sector: Water
Waste Water Pump Upgrade. Pre-Fabricated Set Installation
We’ve recently completed the replacement of an ageing waste water pump set with a new pre-fabricated twin pump system, delivering a cleaner install, improved reliability, and easier maintenance for the client.
What’s Changed
The old installation had:
▪ Inefficient pipe routing
▪ Limited isolation options
▪ Poor access for maintenance
▪ Higher risk of downtime during servicing
The new system features a fully pre-fabricated stainless steel pipework assembly built off-site and installed with minimal disruption.
What’s Better Now:
✔ Pre-fabricated pipework
Built and tested in our facility for quality, accuracy, and faster site installation.
✔ Improved flow path
Swept bends and cleaner routing reduce turbulence and head loss, improving pump efficiency.
✔ Proper isolation & non-return protection
New full-bore isolation valves and check valves allow safe servicing without shutting down the whole system.
✔ Maintenance-friendly layout
Clear access to pumps, valves, and flanges makes future work quicker and safer.
✔ Twin pump resilience
Duty/standby configuration ensures continuous operation during maintenance or in the event of pump failure.
✔ Modern pump package
New high-efficiency units from BBA Pumps provide improved performance and reliability.
Another solid example of how pre-fabrication + good design = less downtime, safer maintenance, and a longer-lasting installation.
If you’re looking at upgrading ageing pump systems, we can survey, design, prefabricate and install complete packages.